Weeks, but the upper floors were completed with a floor everyĪfter three floors of CLT were installed, the framers had to Two days to install, including installation of the splines, The framers then moved to the other side and Leveled, they were screwed together with long diagonal screws Once the columns and beams were plumbed, squared and The wood columns and beams were installed on the east sideįirst. To make up for some of the tolerances in the steel basesĪcross the ground floor before the CLT arrived. The first floor wood columns were sized to assume for Trades worked together to achieve a tight tolerance across theīoard. Tolerances for concrete are ½” to 1” depending on location,Īnd up to ¾” for structural steel. The wood package required a tolerance of ⅛”, yet acceptable It was essential that the steel and concreteĪccept the CLT panels that were ready and waiting in Canada.